InTech, February 2012
By Russel Treat, EnerSys
Many pipeline operators will spend substantial time and effort reworking their control rooms and systems to comply with the new Pipeline Hazardous Materials Safety Administration’s Control Room Management rule by 1 August 2012. Done right, this could significantly improve their operations.
The Installed Base Audit simplifies measurement device maintenance, helps a plant conform to various regulations and safety requirements, and reduces its Total Cost of Ownership.
PlantServices.com, February 2012
By Brian Anulies, GE Energy Industrial Solutions
Research shows that industrial facilities are 28% more likely to have a safety incident when maintenance work on a motor is reactive versus planned.
Control Engineering Europe, February 2012
The motivating factors for installing wireless sensors are easy to see – simplicity of installation and operational flexibility. The main challenges for safe wireless communication are to guarantee a short response time and to immediately detect loss of contact with sensors.
InBound displays physical constraints such as a vessel’s Maximum Allowable Working Pressure, design constraints such as relief valve settings, and safe operating limits.